Castle College - Groundbreaking learning
The result was an eight storey city-centre tower that looks as attractive outside as it does inside.
Our part in the project lasted twelve months and was completed on time and on budget. We overcame several challenges during the build. The acoustic requirements were particularly demanding because of the exposed soffits. To get around the problem we used what are known as acoustic plaster tiled bulkheads.